SignalsAZ.com - Arizona News Podcast

Glassford Hill Road Construction Update Released | Mar 16th - 20th

Use Left/Right to seek, Home/End to jump to start or end. Hold shift to jump forward or backward.

0:00 | 1:05

Send us a text and chime in!

Construction work continues this week on the Glassford Hill Road Widening Project, with crews performing roadway excavation, drainage culvert and wall construction, and installing a new effluent water main. The work is taking place along Glassford Hill Road between Bear Path and Ainsley Way and is scheduled for Monday, March 16, through Friday, March 20, from 7 a.m. to 7 p.m. During construction, one lane of traffic in each direction will remain open, and businesses, schools, and residential areas will remain accessible. However, motorists should expect possible travel delays, construction equipment in the roadway, and traffic control devices throughout the...

 

For the written story, read here >> https://www.signalsaz.com/articles/glassford-hill-road-construction-update-released-mar-16th-20th/

Check out the CAST11.com Website at: https://CAST11.com 
Follow the CAST11 Podcast Network on Facebook at: https://Facebook.com/CAST11AZ
Follow Cast11 Instagram at:
https://www.instagram.com/cast11_podcast_network

Podcasts we love

Check out these other fine podcasts recommended by us, not an algorithm.